Q3 Finish-A-Long Goals

How do I make goals for this quarter? I can’t even seem to get any time to sew or cut or… You get the picture. The big sorting, emptying, moving stuff around project is consuming our days and nights here. Sigh. At least there are only a couple of weeks left of the intense stuff. Then we will gain our two new roommates, and we will all be settling in and getting used to the new living situation. But more about that later.

I think my quilty quarter won’t actually start until mid-August after the AQS Grand Rapids Show.  That being said, I still have some goals from my Q2 list to accomplish so… Here’s the Q2 list. Completed items have been crossed out.

  1. Scrap in a Box (piece backing, layer, baste, quilt, bind)
  2. Christmas table runner (layer, baste, quilt, bind) – I’m actually hoping to complete this this weekend.
  3. 2012 FQS Designer Mystery BOM (assemble top, layer, baste, send out for quilting, bind)
  4. Heart Quilt – bind

So, basically, for this quarter I really want to finish Scrap-in-a-Box and the 2012 FQS Designer Mystery BOM. Two things. That’s all. Here’s what they each need:

  • Scrap in A Box needs the backing made, sandwiching, quilting and binding. I’m pretty sure I plan to quilt this one myself because I think I want all walking foot quilting on it.
  • 2012 FQS Designer Mystery BOM – I need to finalize my block setting ideas and complete the top, send it out to be longarmed, and then bind it.

If I actually accomplish these, I will feel very good about this quarter even though I will have spent half of it not quilting at all.

Quilt on!

2 thoughts on “Q3 Finish-A-Long Goals

  1. I do hope you will be able to complete your two goals even though you are very busy. I look forward to seeing your progress.

Comments are closed.